The project may change current rooms, add to the house or do both. Under Austin HOME rules, the key question may be the final number of homes. Confirm whether the site will have two or three units. Do not rely only on the word “accessory.”
Define the unit boundary
Draw where one dwelling ends and the other begins. Show exterior entrances, any internal connection, shared circulation, yards, storage, parking, meters and equipment. State which household controls each space.
The legal, fire, sound, privacy and system design depend on this boundary. A lockable door alone does not confirm the complete solution.
Test the existing house as a host
Collect plans and inspect the areas affected by the work. Find structure, foundation, roof, exterior walls, drainage, electrical service, plumbing and HVAC. For internal work, record ceiling height, windows, egress and the route to an independent entrance.
An addition also requires whether the site can support the project. Map trees, setbacks, easements, impervious cover and work access just as you would for a detached unit.
Choose between reorganization and addition
Reusing current space can reduce outside work. It may take useful rooms from the main home or create a poor layout. An addition can protect the house plan but needs a new base, roof and drainage. It also needs outside design work.
Compare both options against household function, building disruption, systems and complete cost. Do not assume fewer new square feet produces the better project.
Give each household independent daily function
Review sleeping, cooking, bathing, laundry, storage, waste, mail, deliveries and outdoor access. For multigenerational use, discuss privacy, supervision, accessibility and how the arrangement may change over time.
Place windows and doors to avoid unnecessary conflict. Consider where guests arrive and whether one household must cross the other’s private area.
Design sound control as an assembly
Noise travels through walls, floors, ceilings, doors, ducts and plumbing. Ask the design to state the separation assembly and flanking-path details. Coordinate equipment and wet rooms so ordinary daily use does not create avoidable disturbance.
“Insulated wall” is not a performance description. The drawings and scope should identify the materials and wall penetrations.
Coordinate structure and weather protection
For an addition, show how the new base, walls and roof join the current home. Explain how the design handles water and movement between old and new parts. For inside work, find changes to support walls, openings and added strength.
Austin sun and heavy rain make the roof/wall transition important. Require flashing and drainage details rather than leaving the connection to field improvisation.
Decide what systems are shared
List electric panels, water, wastewater, heating/cooling, hot water, internet and controls. State whether each is shared or independent and how use can be isolated for maintenance. Confirm addressing and any company rules.
An independent household may still use branches from current services. But capacity and route need evidence. See utilities and site work.
Plan construction around occupancy
Attached work can affect kitchens, bathrooms, hallways and services in the main home. The agreement should cover barriers, temporary closures and notice before service shutoffs. It should also address weather protection, security and daily cleanup. Protect children, pets and residents from the work zone.
Ask if the home must be empty at any stage. Put those dates in the schedule and owner budget.
Match the permit file to the actual work
The permit filing should show the current and planned homes. It should also show structural changes, fire-safety separation, energy work and building systems. Austin requires a unique address for each new unit and uses Residential Plan Review for new construction and additions.
Keep the approved plans and conditions. If plan review changes the unit boundary or shared systems, update the price before work begins.
Price the effect on both sides
The budget should cover the new unit and work inside the main home. Add demolition, repairs, temporary protection, utility changes and matching finishes. Keep optional owner upgrades separate from work needed for the ADU.
The Austin cost guide prevents main-house work from disappearing outside the headline.
Plan the occupied-home interface room by room
Mark every room affected by demolition, temporary walls, service shutdowns, dust control or trade access. Find working hours, secure separation, bathroom and kitchen interruptions, pets, children and storage moves.
The contract should assign cleaning, protection and repairs. A small connection detail can disrupt a much larger part of the house. The site plan and schedule should show the effect on daily life. The size of the new unit tells only part of the story.
Build a final approval test for two dwellings
Confirm addressing, locks, alarms, ventilation, utility labeling and approved separation on both sides. Retain final inspection records and the issued plan set. If the main house was altered, include those corrections and finishes in the same completion walk.
Frequently asked questions
Is an attached ADU the same as a duplex?
Not automatically. Austin’s license type depends on current code and the planned arrangement. Ask Development Services and the design team to find the correct use and filing.
Must the units have different utilities?
Rules and owner preferences vary. Capacity, company rules, metering goals and maintenance should be resolved for the address.
Can the connecting door remain?
That depends on the approved design and separation rules. Treat it as a documented code/design choice.
Is internal conversion less disruptive than an addition?
It may involve less exterior building but can cause more daily intrusion inside the occupied house. Compare the actual sequence and temporary conditions.